What You Can Build Without a Permit in Cochise County

A 200 sq ft shed is exempt until you run power to it. The county's exemption list, the $1,000 threshold, and the fence rule that catches people.
Cochise County publishes a list of single-family residential projects that do not need a building permit. It is genuinely useful, and it is also narrower than people remember it being — because most of the entries carry a condition, and the conditions are where the trouble is.
Start with the threshold everything sits on. Per state law, building permits are required for new structures or renovations of existing structures that meet or exceed $1,000 in value. Below that, and within the exemption list, you are clear. Above it and outside the list, you are not.
The condition people forget: the shed exemption covers "one-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided that the floor area is not greater than 200 square feet and there are no utilities."
Two conditions, and the second is the one that bites. Run a light circuit or a hose bib to that shed and it is no longer the thing the exemption describes.
The entries that matter most on rural land
The full list covers building, electrical, gas, mechanical, plumbing and a catch-all "other". These are the ones that come up on parcels out here:
| Project | The limit |
|---|---|
| Storage shed | ≤200 sq ft, one storey, detached, no utilities |
| Water tank on grade | Capacity ≤5,000 gallons and height-to-width ratio no more than 2:1 |
| Deck | Under 30 inches above the lowest grade within 5 feet of the deck edge |
| Retaining wall | Up to 4 feet in height |
| Fence — wood, block or wire | Up to 7 feet high, but see the informational permit trap below |
| Satellite dish / residential antenna | Exempt |
| Concrete walkways and patio slabs | Exempt, provided not in county right-of-way |
| Prefabricated pool | Under 24 in deep, ≤5,000 gallons, entirely above ground |
| Re-roof, re-side, replace windows or doors | Exempt where there are no structural changes |
The water tank entry is the one worth writing down if you are on hauled water. Five thousand gallons is a serious tank, and the 2:1 ratio quietly rules out the tall narrow ones — a tank twice as tall as it is wide is at the limit, and anything more slender than that is outside the exemption regardless of capacity. Our hauled water versus drilling piece covers the storage sizing side.
The fence trap
Fences up to seven feet are exempt from a building permit — and then the county adds a list of situations where an informational permit is required anyway. A fence needs one if any of these apply:
- it is on a corner lot and greater than 3 feet in height;
- it is within a designated FEMA Flood Hazard Area;
- it is within a designated wash; or
- it is in a platted subdivision.
Two of those four are about water, which is not a coincidence. Fencing is one of the activities that can trigger a floodplain use permit in its own right — building, grading, filling, walls and fencing are all named. So a fence line crossing a wash is a fence line with paperwork, even though a fence is nominally permit-exempt.
Worth reading alongside the fencing question generally, because in open range the fence you actually need is a statutory one — posts no more than 30 feet apart, four wires, top wire at 50 inches — and that specification has nothing to do with whether a permit is required.
Exempt from a permit is not exempt from the rules
This is the distinction the whole page turns on, and the county states it plainly: regardless of whether your project requires a building permit, it must still be constructed in conformance with the regulations of the jurisdiction and all applicable state laws.
Concretely, a permit exemption does not exempt you from:
- Zoning setbacks — measured from the closest point on the property line or the edge of road travelway, whichever is closer.
- Floodplain rules, which the exemption page itself flags: depending on location, a floodplain permit may still be required.
- The watercourse erosion setback, 50 to 300 feet from the primary bank depending on peak flow, which applies to structures whether or not you are in mapped floodplain.
- Septic protection. Nothing about a permit exemption makes it acceptable to put a shed or a slab on the reserve area your evaluator identified — see the septic guide.
And one scope limit that catches people running anything commercial: the exemption list is for single-family residential projects. A permit is required regardless of the dollar value of the improvement when building code requirements apply for non-residential uses.
How this fits the build sequence
The exemptions are most useful in the gap between buying and building, when you want somewhere to put tools and a tank without starting the permit clock. A 200 square foot unpowered shed and a 5,000 gallon tank on grade will cover a surprising amount of that.
What they will not do is let you live there. Camping on vacant land is not permitted, and an RV needs an existing principal use or an active build — covered in living in an RV while you build. And if you are heading for the owner-builder route, none of these exemptions change the eligibility rules there.
What we could not confirm
- We could not confirm what an informational permit costs, how long it takes, or exactly what it involves beyond being required in the four fence situations listed.
- We could not confirm how "no utilities" is assessed for the shed exemption — whether a solar panel and a battery on the shed counts, for instance. Ask before you wire it.
- We could not confirm whether the 200 square foot shed limit is measured to the exterior wall or the interior floor area, which matters at the margin.
- We could not confirm how the county treats several exempt sheds on one parcel, or whether they are considered cumulatively.
- We could not confirm the current fee schedule for anything on this page. The county publishes a Development Services fee schedule and interactive calculators.
- The exemption list is described by the county as typical examples rather than an exhaustive statement. If your project is not obviously on it, that is a phone call rather than an assumption.
The short version
State law sets the threshold at $1,000 in value, and Cochise County publishes a list of single-family residential projects that are exempt below and around it. The useful ones out here are a detached storage shed at 200 square feet or less with no utilities, a water tank on grade up to 5,000 gallons with a height-to-width ratio no steeper than 2:1, a deck under 30 inches, a retaining wall up to 4 feet, and fences up to 7 feet. That last one carries a catch: an informational permit is still required on a corner lot above 3 feet, in a FEMA flood hazard area, in a designated wash, or in a platted subdivision. And exempt from a permit never means exempt from the rules — setbacks, floodplain, the watercourse erosion setback and your septic reserve area all still apply. The shed exemption dies the moment you run a wire to it.
Sulfur Springs Land Management does the pads, access and drainage that sit underneath all of this, permitted or not.
Gear for this job
Affiliate links — we may earn a commission from purchases at no extra cost to you. We only list gear we would actually put on a job.
- Robert Manufacturing R400-1 Bob Red Brass Float Valve, 1 in NPT — If you are running a tank under the 5,000 gallon exemption, a mechanical float is what stops a delivery becoming a flood.
- Lifegard Aquatics 1 Inch Bulkhead Fitting Kit — Tank penetrations done properly the first time. The exemption covers the tank; it does not cover the puddle.
- HM Digital TDS-EZ Water Quality Tester — Cheap way to notice when what comes out of storage is not what went in.
- Komelon Open Reel Fiberglass Tape Measure, 300 ft — Setbacks, the 200 square foot shed, and the 30-inch deck are all things worth measuring rather than estimating.
Ready to Develop Your Land?
Sulfur Springs Land Management specializes in land clearing, grading, solar system consultation, and comprehensive off-grid property development. Let's turn your land into your dream off-grid property.
Contact SSLM TodayMore from the Blog
Getting Power to Rural Land: The Estimate Is Not a Price
SSVEC can bill for unanticipated costs up to six months after the work, and obtaining the easements is your job. What a line extension involves.
Rural LivingSplitting a Parcel: The County Will Record a Bad Split
A minor land division permit does not split your land — the deed does. And a split with no legal access can still be recorded if the deeds say so.
Rural LivingRunning a Business From Rural Land: The 25% Rule
Cochise County caps a home occupation at 25% of the residence floor area — even in a detached shop — and prohibits outdoor storage entirely.
Rural LivingSecond Dwellings: What Cochise County Allows on One Parcel
An ADU needs planning approval before any building permit, the owner must live on site, and an RV never qualifies. Park models do, with conditions.
Rural LivingFloodplain Rules Reach Further Than the Flood Map
A floodplain use permit covers grading and fencing, not just building — and watercourse setbacks of 50 to 300 feet apply to every structure.
Rural LivingThe Owner-Builder Option That Costs You the Certificate
Cochise County's no-inspection owner-builder path is cheaper and never gets a Certificate of Occupancy. What that means for lenders, insurers and buyers.
Rural LivingYou Cannot Camp on Your Own Vacant Land in Cochise County
The county's answer is a flat no — camping needs an established use on the parcel. What a temporary use permit actually allows while you build.
Rural LivingOpen Range: In Arizona You Fence Cattle Out, Not In
Arizona law bars recovery for livestock trespass unless your land sits inside a statutory lawful fence — and the statute specifies the wire spacing.
Rural LivingRural Internet: The FCC Map Shows Claims, Not Service
The national broadband map reports what providers say they offer at your parcel. How to check it, and the two challenges you can file when it is wrong.
Rural LivingDefensible Space in Cochise County Starts at the Driveway
Arizona's home ignition zones run 0-5, 5-30 and 30-100 feet. But an engine needs 12 feet of width and 15 of clearance to reach you in the first place.
Rural LivingA Composting Toilet Does Not Get You Out of a Septic System
Arizona excludes the kitchen sink from gray water, so a composting toilet still needs septic. The Type 4 permit, percolation testing and the reserve area.
Rural LivingOwning Arizona Land You Cannot Legally Reach
A dirt track to your parcel is not legal access. What Arizona's private way of necessity actually is, where easements are recorded, and what to check first.
IndustrySulfur Springs Valley: Two Water Districts, Not One
The valley is not one groundwater basin but two — Willcox in the north, Douglas in the south — with different rules. What every landowner should know.
IndustryHauled Water vs Drilling a Well: The Real Numbers
What a well really costs at 200-350 ft static water level in Sulfur Springs Valley, what hauled water costs per year, and where the break-even sits.
Rural LivingOff-Grid Solar in Winter: Sizing for Cochise County's Worst Days
Cochise County winter drops you to 4-5 peak sun hours. How to size batteries, autonomy days, inverters and charge controllers for the worst week.
Rural LivingB-Grade vs A-Grade Solar Panels: Is the Discount Worth It?
What the A/B grade distinction actually describes, why B-grade panels cost less, and when the cosmetic-versus-electrical trade-off is worth taking.
Rural LivingGoat Kids Hide: The Chihuahua Rule for Off-Grid Livestock
Newborn goat kids hide by instinct and vanish on cleared desert ground. A simple sizing rule for clearing that keeps them findable.
Land PreparationOff-Grid Site Prep Checklist: Pad, Access, Drainage, Utilities
A phased checklist for turning raw Cochise County land into a buildable site: survey, building pad, access road, drainage, utilities and septic.
Off-Grid LivingOff-Grid Solar in Arizona: How Many Panels Do You Need?
How many panels an off-grid Arizona property actually needs, what a full system costs in 2026, and the three tiers most Cochise County builds fall into.
Land ClearingLand Clearing in Cochise County: What to Know Before You Start
What land clearing costs in Cochise County, what you may and may not remove under Arizona rules, and which equipment suits mesquite and creosote.
Off-Grid LivingComplete Guide to Off-Grid Water Systems in Rural Arizona
Wells, hauled water, storage and pressure systems for a rural Cochise County property — how the pieces fit and what each one demands of you.